Most leaks are not mysteries. They trace back to a handful of decisions made during construction, and each one is avoidable.
The first is treating waterproofing as a coating rather than a system. A membrane is only as good as its detailing at the penetrations: inlets, outlets, lights, and the construction joints between pours. Those are where water finds its way out, and they are where the work has to be slowest.
The second is rushing the substrate. A membrane applied to a surface that is still green, dusty or uneven will not bond properly, and a bond failure eventually becomes a leak. The waiting is part of the specification, not a delay in it.
The third is skipping the pressure test. Filling the shell and holding it before any finish goes on is the only honest way to know the waterproofing works. It costs a few days. Finding out afterwards costs the tiling.
The fourth is movement. A pool is a rigid box in ground that moves, and if the design does not allow for that somewhere, the shell will crack where it chooses rather than where you planned.
We do the four in order on every project, and we test before we finish. It is not clever, it is just sequence, and sequence is what keeps a pool dry for decades.